![]() ![]() ![]() All asphalt was also removed and replaced on the south side of the building, including parking and sidewalks. A drive-thru was constructed to include an intercom system, signage, and new asphalt. Loose gravel was also removed from the overflow parking lot, and was replaced with asphalt. ![]() We then provided selective demolition work to the existing building as well as asphalt pavement, sidewalks, and concrete curbs and gutters on the east side of the building. Temporary restrooms, power, and a temporary walk-in freezer were set up during the construction and renovation process. We began this project by sectioning off work areas in order to not disrupt the occupied surrounding buildings and patrons frequenting the mini mall. This project was constructed in accordance with the USGBC LEED 2009 Green Rating Building System for new construction. Renovation work also took place to the existing building by providing interior and exterior upgrades. Additional Food Court restaurants were also added, for a total building square footage of 16,500 sq. ![]() level 2 Shoppette Building in place of the existing Troop Store. This project involved constructing the expansion for the 82nd Airborne Mini Mall located on Fort Bragg in North Carolina. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |